Ceilings and Internal Walls Completed

We had intended to do all the plywood ceilings in the house before the internal walls. However, over three ad a half months ago work on the ceilings stopped when we found that the remainder of our batch of BB hoop pine plywood had unacceptable blue stains. We took up this issue with the local supplier, Huskisson Ply.  After countless phone calls to Husskison Ply that were not returned, we even tried phoning the distributor Gunnersons. We were happy to swap the ply sheets for those without blue marks and even pay for the extra transport costs. After three months (!!!) I finally got a reply from Huskisson Ply that we could return the sheets less a 20% restocking fee. So we would only get back 80% of the cost of the sheets.

We resorted through the remaining 26 sheets of ply and measured and calculated exactly how many sheets we needed and the size of each sheet. We worked out that any sheets less than the full width we could use the back of the sheet, as many with blue marks on the front did not have them on the back, and cut off the manufacturers big purple stamps that were on the back of the sheets. Other sheets with only patches of blue marks we managed to cut around the marks, resulting in a bit more wastage as some sheets we could only use about 1/3 of the sheet.

In the end we returned 13 sheets, but due to careful measuring we only needed to purchase 10 new sheets. This made up for the 20% we lost on returning the sheets. We returned the unused sheets to Huskisson Ply ourselves as we needed to get them out of the house as they were in the way where we needed to finish the ceiling in the main room.

The new sheets came from Mister Ply and Wood at Penrith. I had dealt with Chris Carter from Mr Ply several times over the previous few years and should have got all the ply from them in the first place. Instead I chose to go with an unknown local supplier to save on transport costs and support local businesses where I am building. Since I was only getting 10 sheets I was able to pick them up and transport them to site myself, by trailer, saving transport costs. I was also able to go into Mr Ply and Wood and due to my previous poor experience they let me go through the sheets they had in stock and select the ones I wanted.

Main room ceiling half done
We are very happy with the result. The new sheets of ply have slightly less figure in the grain. In the bedrooms we love the interesting swirls in the ply, it was this unique feature of the wood that made us choose to do the ceiling in ply in the first place. However in the larger main room the less figure in the ply works better as it makes the ceiling less busy.

In the smaller rooms, such as the bathrooms, entry and hall we were originally going to have the black expressed joints between the sheets and put up the blocking and painted it black. However, when we realised that the smaller bathroom would only have one joint we realised that this would look a bit silly and decided to butt the sheets together with no express joint. In doing this I tried to match the machine cut joints together. I could not always do this, particularly where I was using the backs of the old sheets as I had to cut the manufacturers stamps off both ends. So I had to cut the ply very carefully and then sand the cut edge until it was perfectly straight, or as near as I could get it. Not doing the express joints meant that I did not have to paint the edges of the ply black, thus the ceilings in the smaller rooms went up quicker.

For the main room we also chose not to have a black border around where the wall meets the ceiling. This had worked well for the first two bedrooms we put the ceiling up in, but in the third bedroom one of the walls was not quite square and this upset the process of trying to get the black border around the room. This is something we will have to try to disguise with some creative rendering.

Butt jointed ceiling in the smaller bathroom
The ceilings in the laundry and top of the hall were covered in one sheet. This was very neat but required careful measuring as the frame along one of the walls in the back section of the house was not straight.

Ceilings covered in a single sheet
With half of the main room ceiling left to finish, illness in the family, looked like delaying the completion of the ceiling. With very good timing my mate Tony offered to come down and help out on the build for the weekend. Over two days the rest of the ceiling went up like a dream thanks to the panel lifter, the 9mm strips of timber used to measure the gaps, careful measuring and Tony's help. It was truly a joy to look up at the completed ceiling in the main room, reminiscent of Japanese Tatami mats on the ceiling.

Completed plywood ceiling
The internal wall sheeting had previously stopped short of the ceilings so that I could put the ceilings in first. With the ceilings done work continued on the internal walls. I had under estimate the number of screws required to put up the internal walls. The house does not have many internal walls, but some of the internal walls are quite high and the raked ceiling meant that none of them could be completed floor to ceiling in one sheet. The built in robes also required more sheeting that it first appeared. I initially bought from Nepean Boltmaster 1,000  x 30mm  and 200 x 20mm fibre cement screws. The shorter screws were for the sheets attached to the cavity sliding door units as the screws could not go through to the other side of the timber side rails of these units. I then bought 300 more of the 30mm screws. Then another 100 x 20mm and 200 x 30mm and a further 200 x 30mm to finish off the job. That adds up to 2,000 screws.

Almost 2,000 screws used
Internal in walls in bedroom and robe sheeted with MgO Board
Bedroom and robe MgO sheeting completed, in late afternoon sun
Before ordering the MgO Board I had done a rough drawing of all the pieces I would need and roughly worked out what pieces I could get out of each sheet. When I cut each sheet of MgO I cut the large pieces out first and worked out the most efficient use of the remaining piece. This way I used the MgO board much more efficiently than I had first calculated. I will have 8 sheets left over after I use one more for the bath hob. The left over MgO Board will be used for the ceiling of the shed I will build later.

Monday, 13 May 2013

Using Magnesium Oxide Board

Unable to finish the ceilings, while we wait to try and exchange the plywood, we started on the magnesium oxide board internal walls. We chose to use the magnesium oxide board (MgO board) as it is breathable and therefore compatible with the hemp walls, but it is also fire proof, mould proof, rot proof. MgO board in a relatively new product in Australia, it is all made in China. Price wise it is cheaper than fibro but more expensive than plasterboard. I researched the Internet for fixing and cutting methods. It was recommended that the MgO board be cut with a jigsaw or a low speed circular saw. I have a circular saw but it is only a high speed one and I did not want to blunt the blade and did not use it. The other option is to score and snap the board but I was not confident that this would give a neat join with an 8mm board. So I used my jigsaw. I quickly blunted the first blade but did not take notice of how sharp the blade was in the first place, so I changed the blade. After two or three cuts the new blade was also blunt. I went to the local hardware store to get a fibre cement blade, as I had been using wood blades, only to find out the no such blade exists. I queried how people cut fibre cement sheets and was shown a tool that looked a bit like a pair of bolt cutters. These would never work on the 8mm MgO sheets. The alternative suggestion was an angle grinder with a masonry blade.

I tried cutting the MgO boards with the angle grinder. it worked well and was easy to get a nice straight line. It was dustier than the jigsaw, but the masonry blade was still going well after more than 20 cuts. The dust is supposed to be non toxic, but any dust is bad, so I made sure I used eye protection and a dust mask when cutting the boards. Cutting the boards was straightforward and not difficult. I set up a large flat area with a couple of movable spare OSB boards, reused from the formwork, so I could make a gap where I needed to cut and leave the remainder of the board supported. This worked well.

The MgO boards are fixed with screws and the boards can be laid vertically or horizontally, depending on the wall dimensions. Vertical joints should be on studs and fixed each 200mm on edges and 300mm centres on intermediate studs. However the instructions also state that the boards should not be fixed with in 60mm of corners, presumably so the corners do not crack off. Also the edge fixings need to be 12mm from the edge, presumable also to prevent cracking. With 40mm wide studs this allowed just enough room to join the boards on a stud. The boards were tapered at the edges so if you were painting them you could tape and fill the joins. As I am rendering the internal walls, so they look the same as the external walls, I am not doing this, but will use a render mesh.

Cut sheet of MgO board installed
Several sheets of MgO board put up
I went to a large chain hardware store looking for fibre cement screws, they have a different tip and cutting barbs under the countersunk head. The hardware store did not have any fibre cement screws so I bought a packet of galvanised timber screws that looked like they had some barbs under the countersunk head. The timber screws worked but were a pain to put in, and were slow, you had to push really hard to get the countersunk heads to go flush without shredding the Phillips head in the screws.

A week later I sourced a box of 1,000 30mm galvanised fibre cement screws with square heads from Nepean Boltmaster.  These were great, went in easy, no chance of shredding the thread. Fibre cement screws were recommended and they definitely make the job easier.

Timber screw in left, fibre cement screw on right
I was one bag of insulation short to finish the house, plus I had not bought insulation for the hallway. I bought the sheep's wool directly form Higgins Insulation and picked it up from their Villawood warehouse to save transport costs. When I complained about one bag of insulation being a batt short and one bag being misshapen, I was advised that their Sydney operation had closed down. Then when I called head office in Queensland I found out that although the Sydney operation had the same "Higgins" name it was separately owned, this meant that I could not do anything about my missing batt and if I wanted to finish the house in sheep's wool I would have to get it from Queensland. If I was going to get one extra bag of insulation, I decided that I might as well do the thinner raftered hallway in sheep's wool insulation as well.

Four not five batts
Misshapen batts, correct batt in the centre
I ordered three bags of R3.0 580 x 1200mm batts. Higgins in Queensland gave me a quote for transport and the first quote was higher than the cost of the insulation. They could see that was ridiculous, so made other enquiries about transport. The next quote was better and less than half the cost of the previous and was half as much again if I collected it from the transport company depot at Wetherill Park. So I collected it from Wetherill Park.

I had put some packs of insulation in the car before and thought I could fit three packs in, but the packs I had collected before were smaller and these were packs of 6 580 x 1200 batts.  I had the family with me as we stopped to pick up the insulation on the way down to Culburra. The lady at the transport company thought there was no way we could fit it all in and my family berated me for not bringing the trailer. So everything was emptied out of the car, my son's seat was moved to one side, and we fitted two packs of batts in the boot and one behind the passengers seat and the rest of our gear was stuffed in around the insulation. We were fortunate I could fit it all in, but lesson learnt when picking up insulation.

Once we had the insulation it was not a problem finishing the installation although one section where the front pavilion joins the main pavilion and all the water and gas pipes were was a little tricky and the insulation had to be slit and tucked around the pipes. The whole house in now insulated and it does make a noticeable difference to the temperature at night.

Work also continued on finding the right render colour. Our earlier render tests showed us that we would need to use some kind of cement colouring oxide to achieve the colour we were after. I went to South Coast Decorative Concrete Supplies hoping to get several different oxides to try out however they only sold the oxides in 9kg bags, which made it too expensive for me to get more than one bag. After much debate I chose Sundance from Concrete Colour Systems.

CCS Sundance oxide

I mixed up small batches of render using 1/20th of a bag of render mix and then divided this in half, making up a mix using 1%, 2% , 3% and 4% oxide. However I only had kitchen scales accurate to 1g to measure out the oxide and I was using such a small amount of oxide I was hard to get it accurate. I have since ordered a set of jewellery scales on E-bay that are accurate to 0.01g.

1% and 2% Sundance oxide when still wet next to the earlier render tests




I chose the Sundance colour as it had an orange tinge to it which I though would counteract the greenish tinge of the uncoloured render. However, the Sundance looked a bit more orange brown than we wanted. We are looking for a light warm yellow. So we bought a 500g jar of Yellow Builders brand oxide from the hardware store. That turned out way too yellow an still has a slight greenish tinge while wet. We then tried the 750g jar of Sandstone Builders brand oxide, although we have not yet seen it dry the test when wet looked too brown. The closest to the colour we wanted was the 2% Sundance so we did a further test of this on the hemp wall and on the MgO Board and will see how this looks when dry. The more accurate scales will allow us to do more accurate tests in the future.


Top row 4%, 3%, 1% and 2% Sundance all dry. Bottom row on MgO Board 2% Sundance, 2% and 1% Sandstone all wet
2% Yellow and 1% Sandstone both still wet in afternoon sunlight

2% Sandstone and 1% Yellow both still wet photographed with flash
Work has now stopped while we wait for the" blue marks on the plywood" situation. We hope to get building again soon.