Tuesday 24 April 2012

Rain and mud, but timber stacked

Heavy rain mid way through last week turned our building pad into a giant mud pie, resembling the Somme more than the south coast. This has delayed the removal of the remaining tree stumps and the commencement of the concreting.


One of the benefits of the block was that it had two accesses, one down the battle axe driveway and the other from a back lane. However, there was still half a truck load of timber in front of the back gate and our concreter was wanting to make use of the back lane access.

Blocked gate
We put in a weekend of work and cleared the access to the back gate, stacking up a large pile of timber to use in the build. We did not quite clear all the timber, but another day of work will finish the job.

Clear gate

Status of the site